Skip to Content

Merton

Colliers Wood Development Plans

Colliers Wood development plans

Project Updates

05/12/2017:

The new library is set to open in late January 2018 and will be arranged over three levels. Visitors are set to benefit from more space given over to books, a coffee shop, community meeting rooms, special activity zones and a larger children’s area.

The temporary library will close on Saturday 16 December to allow staff time to transfer equipment and setup the new Colliers Wood Library. Customers needing to renew loaned items during the interim can take advantage of the borough’s excellent online service. Loaned items can also be renewed or returned to one of Merton’s six other libraries.

07/11/2017:

Construction images of the new library (Oct 2017).

05/09/2017: 

The new Colliers Wood Library is scheduled to open in early 2018. Whilst we are putting the finishing touches to your new library the temporary library at MertonVision at the Guardian Centre, Clarendon Road, will continue to remain open.

Colliers Wood Library- Interior design consultation.

Colliers Wood Library interior consultation results are in

Residents responded to the council with their preferences for how the inside of the brand new Colliers Wood Library should look. The results of a consultation that included two open evenings, an online consultation and a paper consultation can be found here: interior consultation report

Next steps

The Council has taken on board the feedback from residents and will use it to finalise the specification for the interior design of the library. A procurement exercise to secure a provider will begin shortly. 

For additional information of the consultation results please contact the temporary Colliers Wood library on: 020 8274 5799

Overview

Ground Floor

Mezzanine

Lower Ground

Furniture options

Ground floor

Option A and Option A (part 2)

Option B

Mezzanine

Option A

Option B

Lower Ground

Option A and Option A (part 2)

Option B 

Interior Design Options

Option A (Industrial) 

Option B (Modern) 

Option C (Nature) 

Project updates:

12/06/2015: Cabinet has given the go-ahead to the redevelopment of a brand new library for Colliers Wood.  Please bear with us as we close the current building from the 28 July, ready for the contractors to move in and start work. We will be setting up a temporary library at MertonVision, the Guardian Centre, Clarendon Road from 30 July 2015. Opening times will remain the same and you will still be able to enjoy all the facilities currently provided in Donald Hope Library but in a slightly reduced format. 

04/04/2016: The foundations have now been laid for the new Colliers Wood Library site and residents will start to see the building going up further over the next few months. Officers have been working hard to finalise the internal works to the library and will be consulting with residents over the internal design of the library soon. Further updates will be posted on this page.

Take a look at the latest news stories:

Keep an eye on this space for future updates.

Account
Help
 
Recent rating
070118700X
Loading...
Author: Segal, Francesca, 1980-
Recent review
1408314754
Loading...
Author: Carter, Ally
Merton Memories Merton Memories